You’ve found the builder. The quote looks sharp. Then comes the awkward chat: "I’ll need a deposit to secure the slot." How much is normal? Ten percent? Fifty? The answer sits somewhere between custom and law, and getting it wrong costs UK homeowners thousands every year.
At HireAnything we’ve audited hundreds of contracts. The pattern is clear: transparency wins. Cowboy operators demand cash upfront. Verified pros structure payments against progress. Let’s separate the standard from the shady.
The Legal Baseline: What UK Law Actually Says
First, the hard floor. The Consumer Rights Act 2015 states goods and services must be delivered with reasonable care and skill. It doesn't set a statutory cap on deposits for building work. However, the Consumer Contracts Regulations give you 14 days to cancel most off-premises contracts. If a tradesperson claims the deposit is "non-refundable" before work starts, that term is likely unfair and unenforceable.
Unfair Terms & The 10% Rule of Thumb
While no law caps it at 10%, the Competition and Markets Authority (CMA) guidance suggests deposits should reflect actual costs incurred — materials ordered, skip hired, scaffold booked. A demand for 50% upfront on a £20k extension? Red flag. A request for £500 to cover bespoke tiles on a £5k bathroom? Reasonable.
- Materials on site: You pay for what’s delivered. Get receipts.
- Labour: Pay weekly or fortnightly in arrears, not in advance.
- Bespoke items: Only pay the supplier’s deposit, not the builder’s markup.
Standard Payment Schedules: Stage Payments That Protect You
A payment schedule for builders should mirror the build programme. Never pay for "next week" today. Pay for "last week" tomorrow. This is the golden rule of stage payments renovation projects.
Typical Milestone Structure (Example: £30k Rear Extension)
| Milestone | % of Total | Value (£) | Trigger |
|---|---|---|---|
| Deposit / Start on Site | 10% | £3,000 | Scaffold up, ground broken |
| Shell Complete (Wind/Water tight) | 25% | £7,500 | Roof on, windows in |
| First Fix (Electrics/Plumbing) | 25% | £7,500 | Cables/pipes chased, tested |
| Second Fix / Plastering | 25% | £7,500 | Walls skimmed, sockets live |
| Practical Completion (Retention) | 15% | £4,500 | Handover minus snagging |
Pro Tip: Write the schedule into the contract. "Payment due 7 days after milestone certified complete by client." No ambiguity.
Retention Money: Your Leverage for Snagging
This is where retention money construction UK practice saves bacon. Hold back 2.5% to 5% of the contract value (often the last half of the final stage payment) until the final payment snagging list is cleared. Not "mostly done." Cleared.
How to Manage the Snagging List
- Walk the job with the builder. Tap tiles. Check reveals. Test every socket.
- Photograph every defect. Date stamp them.
- Agree a written list. Both sign. Set a deadline — usually 14 to 28 days.
- Release retention only when the list is zero.
If they walk away? You have a fund to pay someone else to finish. That’s the point.
Red Flags: When to Walk Away Before You Pay
We see the same horror stories on the HireAnything platform. Avoid any tradesperson who:
- Demands cash only. No invoice, no VAT number, no trace.
- Refuses a written schedule. "Trust me, mate" isn't a contract.
- Asks for money to "pay the lads" on Friday before materials arrive Monday.
- Cannot show £5M Public Liability Insurance certificate. Check the expiry date.
- Pressures you to pay "today or I walk." That’s coercion, not business.
Verifying Your Pro
Every supplier on HireAnything carries verified £5M Public Liability, trade body membership (FMB, NAPIT, Gas Safe where applicable) and recent client reviews. We don't list cowboys. Booking 3 to 6 weeks ahead via our marketplace locks in compliant pros for peak season — no panic hiring.
Payment Methods: Protection Built In
How you pay matters as much as how much.
Credit Card (Section 75)
Pay the deposit (or whole job if £100–£30k) on credit card. Section 75 Consumer Credit Act makes the card provider jointly liable. If the builder vanishes, the bank refunds you. Powerful.
Bank Transfer
Standard for stage payments. Use the sort code/account on the headed invoice. Confirm verbally — email interception fraud is real.
Escrow / Staged Payment Accounts
For projects over £25k, consider a client-held retention account or third-party escrow. Funds release on joint instruction. Removes the "chase the builder" dynamic entirely.
Frequently Asked Questions
What is a reasonable tradesperson deposit amount UK?
Typically 10% of the total quote or the cost of specific bespoke materials ordered for your job. Never pay more than the tradesperson’s actual outlay before work starts. Get a receipt detailing exactly what the deposit covers.
Can I withhold payment for bad workmanship?
Yes. Under the Consumer Rights Act 2015, you can withhold a "reasonable amount" reflecting the cost to remedy defects. Notify the builder in writing, listing the faults and the deduction. Do not withhold the full balance — only the cost to fix.
What happens if the builder doesn't finish the job?
If you’ve paid for work not done, you have a claim for breach of contract. Your retention fund (if held) covers completion. If not, you’ll need quotes to finish and a Letter Before Action. Section 75 credit card claims work here too if the deposit was paid on card.
Should I pay VAT on the deposit?
If the tradesperson is VAT registered, VAT applies to the whole invoice including deposit. The invoice must show their VAT number. Non-VAT registered traders (turnover under £90k) cannot charge VAT. Check their status on the HMRC website if unsure.
Money flows best when trust is documented. Vague agreements breed disputes. Clear schedules build extensions. At HireAnything, we connect you with verified tradespeople who quote transparently, schedule payments fairly, and carry the insurance that protects your home. Stop guessing. Start building.