You wouldn't buy a car without a receipt. Why hire a builder without a contract? At HireAnything we've audited hundreds of jobs gone sideways. The pattern is always the same. Missing paperwork. Vague quotes. Deposits vanishing into thin air. This guide stops that happening to you.
The Paperwork You Cannot Skip
Paperwork feels boring. Until the roof leaks. Or the sparky disappears. Then it becomes the only thing that matters. Get these three documents signed before a single tool hits your floor.
Quotes vs Estimates – Know the Difference
A quote is fixed. An estimate is a guess. Legally binding vs roughly indicative. Always demand a written quote. It must detail labour, materials, VAT, and a start/finish date. If they refuse? Walk away. A proper quote protects you under the Consumer Rights Act 2015. It locks the price. An estimate lets them inflate the bill halfway through.
The Contract – JCT Minor Works or Bespoke?
For jobs over £5,000, a JCT Minor Works Contract is the gold standard. It covers insurance, delays, practical completion, and retention. For smaller jobs? A simple written agreement works. It must include: scope of work, payment schedule, variation procedure, and termination clauses. No contract means no leverage. Verbal agreements are worth the paper they're written on.
Insurance Certificates – Your Safety Net
Check Public Liability Insurance. Minimum £5 million cover. Ask for the certificate. Check the expiry date. If they employ subcontractors, they need Employers' Liability Insurance (£10m legal minimum). No cert? No entry. HSE inspectors check this. You should too.
- Written Quote: Fixed price, detailed breakdown, VAT number.
- Signed Contract: JCT Minor Works (large jobs) or bespoke agreement (small jobs).
- Insurance Proof: Valid PLI (£5m+) & ELI (£10m+ if staff employed).
- Schedule of Works: Milestones tied to payments.
- Waste Carrier Licence: Legal requirement for rubbish removal.
Deposits, Stage Payments & Retention Money
Cash upfront feels normal. It isn't. The law limits what they can ask. The Construction Act 1996 governs payment terms. Ignore it at your peril.
How Much Is Too Much?
Never pay more than 10–25% deposit. For materials only. Never for labour. A demand for 50% upfront is a red flag. It signals cash flow problems. Or a runner. Pay by bank transfer. Reference the invoice number. Get a receipt. Cash payments leave zero audit trail.
Deposit Protection Schemes – Do They Exist for Builders?
Unlike tenancy deposits, no government scheme exists for construction deposits. Your protection is the contract. Stage payments linked to completed milestones. Valued by you. Or an independent surveyor. Never pay for ‘materials on site’ unless they are fixed in place. Stolen materials = your loss.
Retention Money – The 5% Lever
Hold back 2.5–5% of the total contract value. Release half at practical completion. Half after the defects liability period (usually 6–12 months). This is your only leverage for snagging. Without it, getting them back to fix a wonky door is a nightmare. JCT contracts automate this. Bespoke contracts must write it in.
| Payment Stage | Typical % | Trigger | Risk Level |
|---|---|---|---|
| Deposit | 10–25% | Contract signing / material order | High if >25% |
| First Fix | 30% | Structure/roof watertight | Medium |
| Second Fix | 30% | Plastered, wired, plumbed | Medium |
| Completion | 15–20% | Practical completion certificate | Low |
| Retention | 2.5–5% | End of defects period | Your Safety Net |
When Things Go Sideways: Dispute Resolution
Disputes happen. Materials delay. Workmanship dips. Communication dies. Don't panic. Follow the ladder. Skip a rung and you lose credibility.
Step 1: The Conversation
Put it in writing. Email or letter. Not WhatsApp. Describe the breach. Reference the contract clause. Give a reasonable deadline (7–14 days) to remedy. Keep it professional. No threats. This letter is Exhibit A if you escalate.
Step 2: ADR – Adjudication, Mediation, Ombudsman
Construction contracts allow statutory adjudication (Construction Act 1996). Fast. Binding. 28 days. Costs £1,500–£3,000. Cheaper than court. Many trade associations (FMB, NAPIT, TrustMark) offer free mediation. Check if your tradesperson is a member. Ombudsman services (like Ombudsman Services: Property) handle complaints against accredited firms. Free for you.
Step 3: Court – The Last Resort
Small Claims Court (under £10k). No solicitor needed. Fee scales with claim value. Online via Money Claim Online. Enforceable judgment. But... enforcement costs more money. Bailiffs. Charging orders. Winning doesn't guarantee payment. Assess their solvency first.
- Write a formal ‘Letter Before Action’ (LBA). 14-day deadline.
- Check trade body membership for free mediation.
- Consider Adjudication for technical disputes (defects, valuation).
- Small Claims for straightforward non-payment/defects under £10k.
- Document everything. Photos. Emails. Independent expert reports.
Consumer Rights Act 2015 – Your Legal Backstop
This Act is your sword. It implies terms into every contract for services. You don't need to write them in. They exist automatically.
Goods & Services Must Be...
Carried out with reasonable care and skill. Information given verbally or in writing is binding. Price must be reasonable (if not fixed). Timeframe must be reasonable (if not agreed). If they breach? You have tiered remedies.
Remedies: Repair, Replace, Price Reduction
First: Right to repeat performance. They fix it. Free. Within reasonable time. No significant inconvenience. Second: Right to price reduction. Up to 100% if repeat performance impossible or refused. You keep the work. Pay less. Third: Right to reject (goods only, not services). Refund. This applies to supplied materials (boilers, tiles, kitchen units).
Pro Tips from the HireAnything Audit Team
We verify suppliers daily. These habits separate the pros from the cowboys.
- Video the site before they start. Timestamped. Protects against ‘pre-existing damage’ claims.
- WhatsApp group for the job. You, tradesperson, project manager. Written record of every instruction.
- Pay suppliers direct for big ticket items (kitchens, boilers). Avoids markup. Guarantees ownership.
- Snagging list at practical completion. Signed by both parties. Photos attached.
- Check Companies House. Dissolved? Struck off? Phoenix company? Run.
Frequently Asked Questions
Is a verbal agreement legally binding for building work?
Yes, but proving terms is near impossible. The Consumer Rights Act 2015 implies terms, but without written evidence of price, scope, or timeline, it becomes your word against theirs. Always get a written quote and signed contract. Even a detailed email chain is better than nothing.
Can I withhold payment if I'm unhappy with the work?
You can withhold a ‘reasonable amount’ relative to the defect. Not the whole bill. The Construction Act requires you to issue a ‘Pay Less Notice’ within prescribed timeframes (usually 5 days before payment due) stating the reduced sum and basis of calculation. Failure to serve valid notice means the full amount becomes due. Seek advice before withholding.
What if the tradesperson goes bust mid-job?
Check if they have Contractor's All Risk Insurance or a Performance Bond (rare for domestic). If not, you become an unsecured creditor. You'll likely lose your deposit. Materials on site belong to the liquidator unless you paid the supplier direct. This is why stage payments and retention are vital. Limit exposure at every stage.
How long do I have to claim for defective workmanship?
Six years from completion for breach of contract (Limitation Act 1980). Six years from discovery for latent defects (hidden), capped at 15 years total. For Consumer Rights Act 2015 remedies (repeat performance/price reduction), act quickly – ‘reasonable time’ is judged objectively. Don't wait years to complain about a leaking shower.
Right. You have the checklist. You know the law. Now you need the right person. HireAnything connects you with verified tradespeople who carry £5m+ Public Liability, use JCT contracts, and accept stage payments with retention. No cowboys. No guesswork. Post your job today and compare quotes from compliant, local pros.