Let's be honest. Most marquee quotes arrive as a wall of numbers. You stare at the total and wonder: is the flooring included? What about the liner? Why is the delivery charge the same as a weekend in Brighton? At HireAnything we've audited hundreds of live quotes from verified suppliers across the UK. We know exactly where the money goes.
Below you'll find three real-world budget tiers for a 100-guest summer wedding in 2026. No fluff. Just specs, inclusions, and the hidden costs that catch people out.
The £3,000 Tier: Functional Shelter, DIY Decor
This is entry-level. Think village fete, not Vogue. You're paying for a weatherproof roof and four walls. That's largely it.
What £3k Actually Covers (Based on 2026 Quotes)
- Structure: 9m x 18m (30ft x 60ft) traditional pole tent or aluminium frame. White PVC cover. No liner.
- Flooring: Usually excluded. Expect to pay £400–£700 extra for breathable matting or £1,200+ for interlocking boards.
- Lighting: Basic festoon or LED uplighters — maybe 8 units. Power distro board extra (£150).
- Heating: Not included. Gas patio heaters hire at £45–£65 each per weekend.
- Furniture: Zero. You source tables, chairs, bars, loos.
- Install/Strike: 2-day build, 1-day strike. Midweek collection only.
- Compliance: PIPA tagged frame. £5M Public Liability Insurance. Risk assessment & method statement (RAMS) provided.
Pro Tip: Ask if the quote includes ground protection mats for the delivery lorry. Wet March grass + 7.5t truck = a £2,000 reinstatement bill. Most cheap quotes skip this line item.
The Catch List
- No lining = condensation drips on guests by 10pm.
- Pole tents need 2m clearance outside the footprint for guy ropes. Check your site plan.
- Consumer Rights Act 2015 covers you for 'reasonable care and skill' — but 'fit for purpose' arguments get messy if you didn't specify 'lined and heated' in writing.
The £10,000 Tier: The Sweet Spot for Most UK Weddings
This is where 70% of our bookings land. You get a lined, heated, lit space that feels like a venue — not a tent.
Spec Sheet: 100 Guests, Seated Dinner, Dancefloor
- Structure: 9m x 27m Clearspan frame (no centre poles). Ivory or white roof.
- Lining: Full pleated ivory silk liner — roof and walls. Hides the frame, kills condensation, transforms acoustics.
- Flooring: 18mm interlocking boards on adjustable pedestals. Level on sloping lawns. Carpet tiles (choice of 6 colours) included.
- Lighting: 20 x LED uplighters (wireless, colour-match), 4 x chandeliers (crystal or rustic), festoon over dancefloor. Dimmer control included.
- Heating: 3 x 18kW indirect diesel heaters (thermostatic, silent, flued outside). Fuel included for 12hrs.
- Power: 63A 3-phase distro, PAT tested leads, generator hire (20kVA silent) if no grid access.
- Furniture: 10 x 6ft round tables, 100 Chiavari chairs (cushions extra), 2 x poseur tables, bar tables, cake table.
- Toilets: 2 x luxury trailer units (hot water, lighting, music) — £1,100/weekend usually baked in.
- Compliance: Full HSE construction phase plan. Structural calculations for wind loading (BS EN 13782). Named competent person on site.
At this tier the supplier usually project-manages the other contractors — caterers, florists, band. They hold the principal contractor role under CDM 2015. That alone is worth £1,500 of headache avoidance.
Where the Money Leaks
- Chair cushions: £3.50 each. That's £350 you forgot.
- Dancefloor upgrade: Black/white LED starlit floor = +£1,800.
- Weekend surcharge: Some suppliers charge 20% premium for Saturday weddings. Check the small print.
The £25,000 Tier: Bespoke Architecture, Not Hire
You aren't hiring a marquee. You're commissioning a temporary building. Think linked structures, hard floors, climate control, and a project manager who sleeps on site.
The Spec That Justifies the Spend
- Structure: Linked Clearspan frames — e.g., 12m x 30m dining hall + 9m x 15m lounge + 6m x 12m catering pod. All guttered, watertight.
- Lining: Bespoke draped silk, swagged walls, integrated LED starcloth ceiling. Rigging points for 500kg floral chandeliers.
- Flooring: Raised timber deck system (200mm) with underfloor heating. Real oak or painted finish. Level access ramps for wheelchairs.
- Climate: Ducted HVAC system (heating + A/C). Humidity control. Separate zones for dining vs dancefloor.
- Power: 125A 3-phase sync generator bank (N+1 redundancy). UPS for lighting desk & sound. Cable ramps, distro to catering, bar, band, photo booth.
- Glazing: Clear PVC window panels or hard-sided glass modules. Insulated. You watch the sunset without the chill.
- Toilets: 4 x luxury trailers + 1 x accessible Changing Places unit. Attendant service included.
- Staffing: Site manager 3 days pre-build to 2 days post-strike. 24hr on-call during event.
Real quote snippet: "£24,850 + VAT. Includes structural sign-off by Chartered Engineer, CDM Principal Designer appointment, and £10M PLI. Excludes local authority licence fees (est. £350)."
Is It Worth It?
If you're hosting 200 guests in January on a windy Cotswold hill — yes. The HVAC alone prevents the 'coat-on-at-dinner' syndrome. For an August garden party? Probably overkill. Put the difference into the wine list.
Side-by-Side: The Budget Comparison Table
| Feature | £3k Tier | £10k Tier | £25k Tier |
|---|---|---|---|
| Structure Type | Pole / Basic Frame | Clearspan Frame | Linked Clearspan + Hard Walls |
| Lining | None | Full Pleated Silk | Bespoke Draped + Starcloth |
| Flooring | Extra Cost | Board + Carpet Inc. | Raised Deck + UFH |
| Heating | Extra Cost | Indirect Diesel Inc. | Ducted HVAC (Heat/Cool) |
| Toilets | DIY | 2x Luxury Trailers | 4x Luxury + Accessible |
| Project Management | You | Supplier (CDM Principal) | Dedicated Site Manager |
| Typical Lead Time | 3–4 Weeks | 6–8 Weeks | 12+ Weeks |
Hidden Costs Checklist (Print This)
Before you sign, verify these line items exist or are explicitly excluded. Silence = surprise invoice.
- Delivery access: Lorry size vs gate width. Crane hire? (£800+)
- Ground protection: Trackway mats for wet weather access.
- Waste removal: Grey water from loos, packaging, cable ties.
- Generator fuel: Red diesel vs HVO. Day tank refill logic.
- Noise curfew: Generator spec must match local authority limit (often 65dB at boundary).
- Insurance excess: Who pays the £2,500 excess if a guest puts a heel through the floor?
- Cancellation terms: Deposit schedule. Force majeure definition. COVID clauses (still in some T&Cs).
How to Compare Quotes Like a Pro
Don't compare totals. Compare scopes. Ask every supplier for a 'Schedule of Inclusions & Exclusions' on headed paper. If they won't provide one, walk away. At HireAnything we require this from every verified partner before they go live.
Check accreditations: MUTA (Marquee & Temporary Structure Association) membership, PIPA tagging, CHAS or SafeContractor approval. These aren't badges — they're your proof of HSE compliance.
Frequently Asked Questions
How far ahead should I book a marquee for summer 2026?
Peak Saturdays (June–September) need 6 months minimum. The £10k tier suppliers are often fully booked by January. Midweek or off-peak? 3–4 weeks works. Use HireAnything's live availability calendar to see real-time slots.
What happens if the weather destroys the marquee?
Structures are engineered to BS EN 13782 (wind/snow loads). If winds exceed design speed (usually 70mph gust), the supplier must evacuate. Your contract should state: deposit refund or re-build at no cost. Public Liability covers third-party injury. Your event insurance covers cancellation.
Can I supply my own furniture to save money?
Yes, but check the supplier's T&Cs. Some void the floor warranty if you drag non-approved tables across their carpet. Others charge a 'corkage' fee (£200–£500) for external contractors working inside their structure. Get it in writing.
Do I need a licence for a marquee in my garden?
Usually no — under Permitted Development if under 28 days/year. But: listed building? Conservation area? Over 500 people? Alcohol sale? You need a Temporary Event Notice (£21) or Premises Licence. Your supplier should flag this; ultimately it's the hirer's legal duty.
Ready to see real quotes? Stop guessing. Post your 2026 dates on HireAnything. Verified MUTA-registered suppliers bid directly. You compare apples-to-apples scopes, not just prices. No obligation. No spam. Just transparent UK hire.